ECS Electrical Safety Unit

The Electrical Safety Unit (ESU) is an assessment set by the ECS for people applying for some ECS cards, including many related-discipline cards for AV, data, fire, security and building-controls engineers.

Format

Questions
30, four options each
Time
30 minutes
Pass mark
21 of 30 (70%)

Source: ECS ESU delegate guide. Check the ECS website for current details before you book.

The eight topics

TopicIn the test
Basic electrical theory and the dangers of electricity4
Key electrical regulations and legislation2
Safe working practices on electrical installations3
Identify cabling and wiring practices5
Limits and boundaries when working on electrical installations2
Basic electrical equipment types4
Risk assessments, method statements, safe systems of work and permits to work4
Basic requirements of testing electrical installations6

Free practice mock

30 original questions across all eight topics. One minute per question, like the real test.

ESU practice mock 0/30 answered 30:00
Question 1 of 30A 230 V supply is connected across a resistance of 46 Ω. What current flows?
Question 2 of 30You find a colleague who is still in contact with a live conductor and cannot let go. What should you do first?
Question 3 of 30Under the safety signs regulations, what does a warning sign, such as one for electrical danger, look like?
Question 4 of 30You see a small burn mark on a colleague's hand after an electric shock. Why should they still get medical attention?
Question 5 of 30Which regulation of the Electricity at Work Regulations 1989 sets the conditions under which work on or near live conductors may be carried out?
Question 6 of 30What is the legal status of BS 7671, the IET Wiring Regulations?
Question 7 of 30You have isolated and locked off a circuit. What must you do with your approved voltage indicator before starting work?
Question 8 of 30After switching off and isolating a circuit, why should you fit your own lock to the isolator and keep the key?
Question 9 of 30Which instrument is the right choice for proving a circuit dead during safe isolation?
Question 10 of 30In a new three-phase installation using the harmonised cable colours, what are the colours of line conductors L1, L2 and L3?
Question 11 of 30In a single-phase circuit wired in the harmonised colours, what colour is the neutral conductor?
Question 12 of 30On a UK 400 V three-phase supply, what is the nominal voltage between any one line conductor and neutral?
Question 13 of 30You open an older three-phase distribution board that was wired before the harmonised colours were introduced. Which colours would you expect for L1, L2 and L3?
Question 14 of 30BS 7671 reserves the green-and-yellow colour combination for one purpose. What may it be used to identify?
Question 15 of 30Under BS 7671 definitions, what is the upper limit of extra-low voltage (ELV) for an a.c. system?
Question 16 of 30Under BS 7671 definitions, what range of a.c. voltage is classed as low voltage (LV)?
Question 17 of 30In a solar PV or battery storage system, what is the main job of the inverter?
Question 18 of 30What does a step-down transformer do?
Question 19 of 30A 110 V site transformer has its output winding centre-tapped to earth. What is the maximum voltage to earth at its output?
Question 20 of 30What is an RCBO?
Question 21 of 30Which regulations require employers to make a suitable and sufficient assessment of the risks to their employees and others?
Question 22 of 30What does a method statement mainly set out?
Question 23 of 30In the hierarchy of control, which type of measure should you consider first?
Question 24 of 30Under section 2 of the Health and Safety at Work etc. Act 1974, what must an employer provide so far as is reasonably practicable?
Question 25 of 30Which of these tests must be carried out with the circuit isolated, before it is energised?
Question 26 of 30Initial verification of a new installation includes an inspection. When is it normally carried out?
Question 27 of 30What does a polarity test confirm?
Question 28 of 30You are about to carry out dead tests, such as continuity and insulation resistance, on a circuit in an existing installation. What must you do first?
Question 29 of 30Why is a continuity test carried out on each conductor of a ring final circuit?
Question 30 of 30On a schedule of test results, what does the value R1+R2 represent?